What's Inside
A field-ready checklist built on NFPA 99, CMS CoP, and Joint Commission standards
-
Section 1 — Pre-Inspection Preparation Equipment inventory verification, inspector credentials, test equipment calibration requirements, and interval confirmation.
-
Section 2 — Visual Inspection Power cords, strain reliefs, plugs, enclosures, alarms, labels, accessories, and fluid ingress — per device.
-
Section 3 — Electrical Safety Tests NFPA 99 leakage current limits at a glance (chassis, patient lead, open ground), ground wire resistance limits, and test recording fields.
-
Section 4 — Equipment Categories Infusion pumps, monitors, beds, ventilators, and more — with risk level and required inspection interval for each category.
-
Section 5 — Surveyor Hot List The top 10 citation triggers CMS and state surveyors look for first. Verify these proactively before any survey.
-
Section 6 — Post-Inspection Sign-Off Out-of-service tagging, work order creation, documentation, and administrator sign-off fields for your compliance file.
Based on NFPA 99 (2021 Edition)
CMS Conditions of Participation
Joint Commission EC Standards
100% free — no credit card
Get the Free Checklist
Instant PDF download — no spam, ever